All Issue

2026 Vol.19, Issue 2 Preview Page

Original Article

30 June 2026. pp. 41-47
Abstract
References
1

American Water Works Association. (2012). Water Meters: Selection, Installation, Testing and Maintenance (Manual M6, 5th Edition). Denver, CO: AWWA.

2

Arregui, F. J., E. Cabrera Jr., R. Cobacho, and V. Palau. (2003). Management Strategies for Optimum Meter Selection and Replacement. Water Science and Technology: Water Supply. 3(1-2): 143-152.

10.2166/ws.2003.0097
3

Arregui, F., E. Cabrera Jr., and R. Cobacho. (2006). Integrated Water Meter Management. London: IWA Publishing.

4

Arregui, F., J. Soriano, E. Cabrera, and R. Cobacho. (2012). Nine Steps Towards Better Water Meter Management. Water Science and Technology. 65(7): 1273-1280.

10.2166/wst.2012.009
5

Cheongju City. (2009). Service Report on Calculation of Replacement Unit Prices for Meters with Expired Verification Validity Periods. Cheongju: Cheongju City.

6

Cordeiro, C., A. Borges, and M. R. Ramos. (2022). A Strategy to Assess Water Meter Performance. Journal of Water Resources Planning and Management. 148(2): 05021027.

10.1061/(ASCE)WR.1943-5452.0001492
7

Criminisi, A., C. M. Fontanazza, G. Freni, and G. La Loggia. (2009). Evaluation of the Apparent Losses Caused by Water Meter Under-Registration in Intermittent Water Supply. Water Science and Technology. 60(9): 2373-2382.

10.2166/wst.2009.423

Korean References Translated from the English

1

청주시 (2009). 검정유효기간 만기계량기 교체단가 산정 용역 보고서. 청주: 청주시.

Information
  • Publisher :Korean Society of Disaster and Security
  • Publisher(Ko) :한국방재안전학회
  • Journal Title :Journal of Korean Society of Disaster and Security
  • Journal Title(Ko) :한국방재안전학회 논문집
  • Volume : 19
  • No :2
  • Pages :41-47
  • Received Date : 2026-04-27
  • Revised Date : 2026-05-23
  • Accepted Date : 2026-05-27